Presentation information

第VI部門

リニューアル (8)

Thu. Sep 5, 2019 10:25 AM - 11:55 AM VI-7 (幸町総合教育棟 第21大講義室)

座長:田永 友則(アサノ大成基礎エンジニアリング)

[VI-1009] Effects of fulcrum displacement measures by resin injection for fatigue crack of trough girder

*早川 健司1、石坂 真二2、松尾 裕一郎2、清水 竜也2、三澤 芳康3、田中 飛鳥3 (1. 東急建設株式会社技術研究所、2. 京王電鉄株式会社鉄道事業本部、3. 東急建設株式会社都市開発支店)

Keywords:Trough girder, Bearing, Bearing displacement, Fatigue crack, Resin measurement, Stress measurement

The target bridge is an overhead track bridge with an oblique angle composed of four trough girders. The tank girder currently in service was replaced in 1983. A crack was found in the end support in a general inspection in 2010. Therefore, for the purpose of prolonging the service life of the trough girder, resin injection to the bearing was carried out as a measure to suppress the tilt of the fulcrum which is considered to be one of the causes of the crack. In this paper, we show the outline of the construction of resin injection, and report on the vertical displacement of the fulcrum before and after injection and the stress measurement results in the vicinity of the stop hole.

Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.

Password