Japan Society of Civil Engineers 2019 Annual Meeting

Presentation information

第VI部門

地下構造物 (2)

Thu. Sep 5, 2019 8:40 AM - 10:10 AM VI-1 (幸町北8号館 811講義室)

座長:服部 佳文(大成建設)

[VI-618] Application of the composite wall for permanent and temporary "J-WALL® II method" which enables underground wall construction in narrow space

*古荘 伸一郎1、黄 再弘1、松原 秀和2、後藤 宏輔2、西口 正仁3、中村 寿人3 (1. 大林組 、2. JFEスチール、3. ジェコス)

Keywords:Underground wall, Composite structure, Hat-shaped steel sheet pile, Seismic isolation retrofit, Used for permanent stuructures

Recently, especially in urban areas, earthquake-resistant construction of existing structures and repair work for the purpose of improving convenience or barrier-free are increasing. In these cases, construction of underground wall is required in an extremely narrow space while existing structures are being used. In the Kagawa Prefecture Government Office East Building seismic renovation currently under construction, the underground wall to be newly built around the building is close to the road, the adjacent land boundary, and the existing underground structure. In areas particularly narrow and confined site, the composite wall for permanent and temporary "J-WALL® II method" is adopted.

Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.

Password