Japan Society of Civil Engineers 2019 Annual Meeting

Presentation information

第VI部門

CIM (3)

Thu. Sep 5, 2019 2:25 PM - 3:55 PM VI-5 (幸町総合教育棟 第11大講義室)

座長:佐藤 靖彦(西松建設)

[VI-946] Efficient Integrated 3D Model Creation for Monitoring Construction Progress

*矢尾板 啓1、瀬戸 康平2、宮田 岩往2、金森 紘代1、木村 恵輔1 (1. 株式会社パスコ、2. 株式会社奥村組)

Keywords:3D Modeling, 3D Measurement, Point Cloud, Procedural Modeling, CIM, Construction Monitoring

Following a global trend for utilizing 3D information such as BIM/CIM, we challenged to create an integrated 3D model representing on-site civil construction progress. A handy laser scanner was used to capture the earth work as point cloud data which is then used for DTM generation. A set of 2D shop drawings was used to create the 3D models of retaining walls. We utilized procedural modeling to enhance the modeling process. Through this project, we have efficiently created an integrated progressive 3D model which enables to grasp and share on-site situation in the digital environment.

Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.

Password