III. Fission Energy Engineering » 305-3 Reactor Design, Construction and Examination of Nuclear Power Station, Aseismatic Design, Nuclear Ship

[1G12-14] Aseismic Enginnering 2 (Seismic test using resonant type shaking table)

Wed. Sep 7, 2016 5:45 PM - 6:35 PM Room G (Kumume City Plaza - Studio 2)

Chair: Takayuki Aoki (Tohoku Univ.)

6:15 PM - 6:30 PM

[1G14] Seismic Test Result of the Main Steam Safety Relief Valve for the Boiling Water Reactor Nuclear Power Plant

*Koji Nishino1, Nobuo Kojima1, Yukio Watanabe2, Kazuyoshi Yonekura1, Shin Kumagai3, Yoshitaka Tsutsumi4 (1.Toshiba Corporation, 2.TOSHIBA NUCLEAR ENGINEERING SERVICES Corporation, 3.Hitachi-GE Nuclear Energy, Ltd., 4.CHUBU Electric Power Co.,Inc.)

Keywords:Seismic adequacy, Safety valve, Main Stearm Safety Relief Valve, Seismic test, Acceleration of checked dynamic functional

沸騰水型原子力発電所に設置される主蒸気逃がし安全弁の地震時機能維持は、既往の耐震試験実績等により評価してきた。しかし、昨今の基準地震動の見直しに伴い主蒸気逃がし安全弁の応答加速度は、既往設計で用いてきた機能確認済加速度を上回る可能性があり、高加速度に対する機能維持評価が必要となっている。また、地震PRAにおける機器フラジリティの観点でも、現実的な機能維持限界を求める必要がある。そこで、これまでにない加速度レベルでの耐震試験が可能な、(一財)電力中央研究所の共振振動台を使用して、主蒸気逃がし安全弁の耐震試験を実施した結果、20G(20×9.8m/s)でも機能維持を確認できる結果を得た。