2017 Fall Meeting

Presentation information

Oral presentation

III. Fission Energy Engineering » 305-3 Reactor Design, Construction and Examination of Nuclear Power Station, Aseismatic Design, Nuclear Ship

[3B05-09] BWR PCV Design and AP1000 Test Run

Fri. Sep 15, 2017 10:35 AM - 12:00 PM Room B (B12 - B1 Block)

Chair:Yoshihiro Kojima (TOSHIBA)

11:05 AM - 11:20 AM

[3B07] Applicability evaluation of steel plate reinforced concrete structure for primary containment vessel

(16)Applicability Evaluation to Primary Containment Vessel of BWRs

*Yu Kuwada1, Yukiharu Ohga1, Junki Ota2, Shohei Sawada3, Isao Kojima4, Ryoichi Nagayama5 (1. Hitachi-GE Nuclear Energy, Ltd., 2. Toshiba Corporation, 3. Kajima Corporation, 4. Shimizu Corporation, 5. The Chugoku Electric Power Co., Inc.)

Keywords:primary containment vessel, steel plate concrete structure, earthquake resistance, pressure tightness

In order to evaluate the applicability of steel plate concrete structure (SCCV) to primary containment vessel, a series of experimental and analytical examinations on earthquake resistance and pressure tightness of SCCV has been carried for 9 years as reported in the previous report (1)-(15). In this report, the applicability of SCCV is evaluated based on the previously reported results.