[3L14] IC was no operation between earthquake and tunami in F1 No.1 Reactor

Observation of the Simulation of F1- No.1 Reactor by TEPCO

*Kiyoshi Yoneyama1, Kazuo Watanabe2 (1. H.O.Yoneyama, 2. WNR-Cx Watanabe Lab.)

Keywords:isolation condenser, F1 No.1 Reactor, simulation, āccident analysis

The IC operations between earthquake and tsunami on 3.11 are clearly denied by us at the Spring Meeting in 2016. TEPCO researcher made an attempt of MAAP analysis for the certification of IC operation, but the pattern of the figure is not credible.

We showed a numerical confirmation of PRV pressure and condenser heat removal.