[2B_PL04] Panel Discussion
Technical issues for the final disposal of the removed soil etc. outside of Fukushima prefecture are discussed. Basic national policy on the final disposal and the effort of volume reduction and recycling of the removed soil by MOE are shared, then independent case studies on various scenarios toward the final disposal considering mass balance calculation of the entire process and societal and economic aspects with stakeholder engagement are presented.