11:20 AM - 11:35 AM
[2I06] Feasibility study of low power HTGR for long-term operation
Keywords:HTTR, MVP, Neutronics calculation, Reactor power, long-term operation
In this study, feasibility study for a low-power HTGR with long-term operation based on the HTTR design was carried out. The fuel enrichment and burnable poison were optimized to achieve 30 years operation with reactor power of 5MW.