2:45 PM - 3:00 PM
[2I08] Development of FBR fuel assembly disassembly and fuel pin bundle shearing technology
(17)Disassembly tests for fast reactor fuel assembly
Keywords:Fast reactor fuel assembly, Disassembly testing machine, Disassembly procedure, Cubic boron nitride cutting-off wheel
A disassembly test machine using a cubic boron nitride (CBN) cutting-off wheel was designed and manufactured, and as a result of carrying out a disassembly test using a simulated fuel assembly based on the disassembly procedure, it was confirmed that the fuel assembly can be disassembled, and data for practical application were collected and problems were arranged.