V. Nuclear Fuel Cycle and Nuclear Materials » 505-3 Decommissioning Technology of Nuclear Facilities

[3H01-04] Decommissioning Technology for Fukushima

Fri. Mar 18, 2022 9:30 AM - 10:35 AM Room H

Chair: Yukihiro Iguchi (Univ. of Fukui)

9:45 AM - 10:00 AM

[3H02] Development of Remote Inspection Method using Advanced Super Dragon Articulated Robot Arm

(1)Project Outline and Measurement Method Development

*Hideharu Takahashi1, Gen Endo1, Ikuo Wakaida2, Hiroshige Kikura1 (1. Tokyo Tech, 2. JAEA)

Keywords:Fukushima Daiichi Nuclear Power Station, Decommission, Remote Technologies, Measurement, Robot

In order to accelerate the decommissioning of TEPCO HD Fukushima Daiichi Nuclear Power Station, it is important to understand the status inside reactors and fuel debris. In this research project, as fundamental research phase, we are developping the remote inspection method such as camera SfM (Structure from Motion), ultrasonic measurement techniques, LIBS (Laser-Induced Breakdown Spectroscopy) on a robot arm for monitoring the structure status in the reactor and the distribution of materials by a long-articulated robot arm with controlling the position and posture of the robot arm hand. In this presentation, the results of the evaluation tests and the future prospects of the remote inspection method will be reported.