9:00 AM - 9:15 AM
[B-20-1] Renewal design strategy of the outer retaining wall of existing primary and secondary school building based on CLT
Keywords:Cross-Laminated Timber, outer retaining wall of existing primary and secondary school building, Renewal design strategy
Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.