The 55th Annual Meeting of the Japan National Conference on Geotechnical Engineering

Presentation information

General session

4. 地盤挙動 (地震時の地盤挙動を除く)

切土・掘削

Tue. Jul 21, 2020 5:00 PM - 6:30 PM Room No. 10

[21-10-5-05] A study on excavation release rate when excavating pile hole due to close construction.

*Tetsuji Yoshimaru1 (1. Kiso-Jiban Consultants Co.,Ltd.)

Keywords:release of insitu stress, excavation, unloading

Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.

Password