The 55th Annual Meeting of the Japan National Conference on Geotechnical Engineering

Presentation information

General session

6. 地盤と構造物 (動的問題を含む)

杭基礎⑨

Wed. Jul 22, 2020 3:10 PM - 4:40 PM Room No. 9

[22-9-4-01] A Case of Existing Pile Removal and Backfill Using Cement and Bentonite Water
– backfill material injecting from top end and bottom and air blow mixing -

*Yuan Zhang1, Yasushi Furugaichi1, Kenjiro Kawasaki1 (1. Tokyu Construction Co., Ltd.)

Keywords:exisiting pile, removal, backfilling

Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.

Password