The 59th Annual Meeting of the Japan National Conference on Geotechnical Engineering

Presentation information

一般セッション

6. 地盤と構造物 (動的問題を含む)

既存杭

Wed. Jul 24, 2024 8:50 AM - 10:30 AM Room 11 (Asahikawa Toyo Hotel Tancho East)

座長:柏 尚稔(大阪大学)

[24-11-1-08] On-site construction test assuming backfilling after removal of
existing piles

*FUKUDA TAKESHI1, Daisaku Sano1, Daiki Matsunagane1 (1. Toda Corporation)

Keywords:pile foundation, existing pile, backfilling

Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.

Password