日本地球惑星科学連合2018年大会

講演情報

[EE] 口頭発表

セッション記号 P (宇宙惑星科学) » P-EM 太陽地球系科学・宇宙電磁気学・宇宙環境

[P-EM15] Dynamics in magnetosphere and ionosphere

2018年5月20日(日) 15:30 〜 17:00 303 (幕張メッセ国際会議場 3F)

コンビーナ:田中 良昌(国立極地研究所)、堀 智昭(名古屋大学宇宙地球環境研究所)、中溝 葵(情報通信研究機構 電磁波研究所、共同)、尾崎 光紀(金沢大学理工研究域電子情報学系)、座長:海老原 祐輔(京都大学生存圏研究所)、長谷川 洋(JAXA宇宙科学研究所)

16:45 〜 17:00

[PEM15-24] Development of unmanned auroral observation system: Operation at Amundsen Bay

*門倉 昭1,2,3,4山岸 久雄1岡田 雅樹1,4小川 泰信1,4田中 良昌1,2,3,4大塚 雄一5 (1.国立極地研究所、2.情報・システム研究機構、3.データサイエンス共同利用基盤施設、4.総合研究大学院大学、5.名古屋大学)

キーワード:オーロラ、無人観測、南極

Space and upper atmospheric sciences group in the National Institute of Polar Research (NIPR) is now developing a new Unmanned Auroral Observation system (UAO), which is equipped with a 3-axis fluxgate magnetometer, all-sky auroral imager, and GNSS/TEC receiver, in the current 9th term Japanese Antarctic Research Expedition (JARE) programme. Electric power of the system is supplied by a hybrid natural energy electric generation system which consists of three sets of 192W wind generators and 8 sets of 62W solar panels. Observation data are stored in a memory card in the system box and also are transmitted via the Inmarsat satellite data communication system to a server in Japan by FTP.
One system of the UAO (UAO-1) was installed at Syowa Station by the 57th JARE in January, 2016, and had been operated until November in 2016 to do a system check before deployment. All the instruments had been normally functioned all through the period without any interruption even during the polar night period. The UAO-1 had been deployed at Amundsen Bay area, which is located about 500 km eastward from Syowa Station, in February, 2017 in the summer operation of the 58th JARE (attached Figure), and started its continuous operation. Due to an insufficient wind speed at the Amundsen Bay site, the system stopped its normal operation and moved into a standby mode from 17 May until 22 August including the polar night period. The UAO-1 re-started its normal operation after that period after the electric power supply by the solar generator increased enough. In our presentation, we will talk about a brief summary of the UAO and the operation results at Amundsen Bay.