Japan Society of Civil Engineers 2019 Annual Meeting

Presentation information

第I部門

橋梁床版 (1)

Thu. Sep 5, 2019 10:25 AM - 11:55 AM I-3 (幸町北3号館 314講義室)

座長:久保 圭吾(宮地エンジニアリング)

[I-343] The report of trial construction in bridge slabs regarding the replaced slabs using the Cotter-joint method. (Part-1) [The verification of the constructability by the said trial construction.]

*山本 忠典1、岩本 陵平2、櫻井 正之3、井隼 俊也4、小野 友彰5 (1. 熊谷組、2. 西日本高速道路、3. ガイアート、4. オリエンタル白石、5. ジオスター)

Keywords:Cotter slab, Trial construction, Rapid construction, Labor saving

The replacing slab method of bridge using Cotter-joint has been jointly developed among four companies, Kumagai Gumi Co., Ltd., Gaeart Co., Ltd., Oriental-Shiraishi Corporation and GEOSTR Corporation. This Slab has been developed for the bridge slab, and made of the Pre-cast and Pre-stressed concrete. This Slab has been developed as the aims to realize the shorten duration, the saving skilled worker, high-quality and the improvement of replace-ability. We report the results which is verified by the said trial construction, as the followings.

Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.

Password