Japan Society of Civil Engineers 2019 Annual Meeting

Presentation information

第III部門

トンネル (3)

Thu. Sep 5, 2019 10:25 AM - 11:55 AM III-1 (幸町北4号館 411講義室)

座長:鍋島 康之(明石工業高等専門学校)

[III-273] Estimation of creep parameters by deformation measurement of borehole diameter

*中岡 健一1、畑 浩二1 (1. 株式会社大林組)

Keywords:creep, borehole, in-situ experiment

We developed the displacement meter to measure the diameter of the borehole in order to evaluate the creep parameters of the rock mass. And measured the borehole diameter at three tunnel sites. Creep diformation was observed at each tunnel sites. By FEM, fitting analysis was performed on the time history of displacement measured. As a result, it turned out that there was a high possibility of setting creep parameters from the result of the displacement meter.

Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.

Password