[III-292] Numerical analysis on heaving of railway roadbed caused by earthquake and effect of aseismic countermeasure work by installation of rock bolts into roadbed

*水野 光一朗1、浅田 章一1、木村 博憲1、嶋本 敬介2、野城 一栄2 (1. 東日本旅客鉄道、2. 鉄道総合技術研究所)

Keywords:mountain tunnels, heaving of roadbed, rock bolts, earthquake, railway

This paper outlines numerical analysis on heaving of roadbed caused by The 2011 Earthquake and effect of aseismic countermeasure work.
JR East has been conducting aseismic countermeasure work to prevent the similar damage. Authors performed numerical analysis of roadbed heaving and effectiveness of countermeasure work, considering the structural properties of tunnels and geological properties of ground around tunnels.
The proposed analytical method could simulate the characteristics of damaged roadbed. And, authors confirmed that installations of rock bolts into roadbed are effective to prevent seismic damage of roadbed, and defined the principle specifications of rock bolts.