Japan Society of Civil Engineers 2019 Annual Meeting

Presentation information

第V部門

特殊舗装

Wed. Sep 4, 2019 10:25 AM - 11:55 AM V-3 (幸町北5号館 523講義室)

座長:藪 雅行(国立研究開発法人土木研究所)

[V-284] combination consideration for mixture for thick layer construction to aim at shortening construction time

*竹林 宏樹1、小林 康範1、高木 良久1、本松 資朗2、上野 洋司3 (1. 西日本高速道路、2. 西日本高速道路エンジニアリング関西、3. 昭建)

Keywords:mixture for thick layer construction, modified asphalt, combination consideration, fluid resistance, shortening construction time, initial rutting

Pavement repair is carried out by thick layer construction for road surface damage that occurred on SHIN-MEISHIN EXPRESSWAY managed by West Nippon Expressway Company. Pavement repair by thick layer construction required long-term traffic control, so it was a problem that large-scale traffic congestion occurred. In order to solve this problem, the text reports the results of formulation study of thick layer construction mixtures aimed at shortening the construction time that enables repair by daily traffic control.

Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.

Password