[V-284] combination consideration for mixture for thick layer construction to aim at shortening construction time
Keywords:mixture for thick layer construction, modified asphalt, combination consideration, fluid resistance, shortening construction time, initial rutting
Pavement repair is carried out by thick layer construction for road surface damage that occurred on SHIN-MEISHIN EXPRESSWAY managed by West Nippon Expressway Company. Pavement repair by thick layer construction required long-term traffic control, so it was a problem that large-scale traffic congestion occurred. In order to solve this problem, the text reports the results of formulation study of thick layer construction mixtures aimed at shortening the construction time that enables repair by daily traffic control.
Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.