Japan Society of Civil Engineers 2019 Annual Meeting

Presentation information

第V部門

維持・修繕(舗装)(2)

Thu. Sep 5, 2019 10:25 AM - 11:55 AM V-3 (幸町北5号館 523講義室)

座長:大脇 真也(高速道路総合技術研究所)

[V-427] Implementation status of measures for longer life of RC slabs by pavement construction

*大槻 敦夫1 (1. 首都高メンテナンス西東京株式会社)

Keywords:Metropolitan Expressway, pavement replacing, Penetration waterproof, RC slabs, Longer life

Based on the pavement design and construction procedure of the Metropolitan Expressway, which was revised from April 2015, the composite waterproofing method was made a standard specification after asphalt cutting in the pavement replacement work. By adopting this method, ①waterproofing of RC floor slab and ② improvement of rigidity and fatigue durability of RC floor slab are added as the purpose and role of pavement replacement work against crack damage of RC floor slab. We summarize the purpose, the implementation situation of RC floor version extension of life measures by pavement replacement repair work from procedure revision to March, 2019.

Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.

Password