[VI-1026] About the design case of existing embankment reinforcement in Kobe Awaji Naruto Expressway Naruto tract
Keywords:Existing embankment reinforcement design, Rebar insertion Construction method, Seepage water removal method in the embankment, Earthquake response analysis, Newmark method
Honshu-Shikoku Interchange Expressway Co., Ltd. has selected a sloped surface for which seismic performance check is required from the height of the embankment, the status of flooded water, past repair history, etc. Soil survey, groundwater level observation, seismic performance check, etc. are conducted. This report carries out soil survey, water level observation and seismic performance check on the slope slope of the expressway embankment of Kobe Awaji Naruto Expressway in Kushimoto City, Hyogo Prefecture, and Since the design of the infiltration water removal work and the embankment reinforcement earthwork were.
Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.