Japan Society of Civil Engineers 2019 Annual Meeting

Presentation information

第VI部門

山岳トンネル (9)

Tue. Sep 3, 2019 10:25 AM - 11:55 AM VI-12 (幸町総合教育棟 第31大講義室)

座長:高市 一馬(大成建設)

[VI-105] Concrete placing height visualization system by pressure gauge installed on center

*齋藤 隆弘1、張 志セン1、小野 緑1、浜田 元1 (1. 株式会社奥村組)

Keywords:lining concrete, placement height, pressure gauge, center, full-scale lining concrete casting

A need for a centrally manageable system of the placing height of lining concrete is increasing. A system that centrally controls the placement height with a relatively small number of sensors was constructed. The height of concrete is converted from the value of the pressure gauge using the fact that the lateral pressure of fresh concrete acts hydraulically up to a certain height. As a result of confirming the applicability of this system in full-scale lining concrete casting, it was found that the required accuracy is obtained when using a Gmax 25 mm ordinary concrete and more flowable concrete.

Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.

Password