[VI-156] Construction performance of sharp curve / steep muddy type propulsion construction under tuff layer
Keywords:sharp curve, steep slope, mud-type propulsion method , tuff layer, bit wear
This report presents equipment for stable supply by linking the Sankyosawa Power Station(substation adjoined)in Sendai City,operated and managed by Tohoku Electric Power Co.,Ltd.,and the Nakasendai substation,which is a peripheral electric station.
Of the projects to be formed,the mud-type propulsion method is used to overcome from the unusually linear Sankyosawa Power Station with a sharp curve of 25R and a steep slope of 11.6% to the Hachiman Joint Groove managed by Sendai City.
Of the projects to be formed,the mud-type propulsion method is used to overcome from the unusually linear Sankyosawa Power Station with a sharp curve of 25R and a steep slope of 11.6% to the Hachiman Joint Groove managed by Sendai City.
Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.