[VI-260] Construction case of tunnel excavation for loose sediment area
Keywords:mountain tunnels, bank, Chemical injection, Auxiliary method, Control blasting
人工的に盛土されたルーズな堆積土砂区間におけるトンネル施工事例の紹介
Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.