Japan Society of Civil Engineers 2019 Annual Meeting

Presentation information

第VI部門

情報化施工 (2)

Tue. Sep 3, 2019 10:25 AM - 11:55 AM VI-9 (幸町総合教育棟 多目的室2)

[VI-387] A basic study on construction method of reinforcing bar for tunnel lining by projection mapping

*青野 泰久1、吉河 秀郎1、竹内 啓五1 (1. 清水建設)

Keywords:Three-dimensional scanner, Projection mapping, mountain tunnel, hanger, reinforcing bar, computer aided construction

In mountain tunneling, in order to applying mechanical function to tunnel lining, reinforcing bars are constructed in tunnel lining at mine mouth or small soil cover section, etc. Hanging metal tools are used to fix reinforcing bars. Positioning work for the hanging metal tools by a total station and cutting work of joint bars have some problems such as time-consuming and requires more manpower. In order to solve these problems, we are developing a newly installation method of hanging metal tools and reinforcing bars using projection mapping technology. We report the procedure of this method, the examination result of the deviation of a projected image, and the test result in the simulated tunnel.

Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.

Password