Japan Society of Civil Engineers 2019 Annual Meeting

Presentation information

第VI部門

施工技術 (2)

Tue. Sep 3, 2019 10:25 AM - 11:55 AM VI-10 (幸町総合教育棟 多目的室3)

座長:西田 与志雄(大成建設)

[VI-43] Application to the shield secondary lining of concrete with improved initial strength development

*澤村 淳美1、土師 康一1、高橋 健一1、竹下 永造2、村手 三郎2 (1. 戸田建設、2. 太平洋マテリアル)

Keywords:Initial strength, Material strength, Shield secondary lining concrete, Long distance pumping, Medium flow concrete

In the case of secondary lining concrete for shield construction, it is often removed after about 15 to 19 hours after placing. The authors conducted a study on the combination of concrete with early-strength expansive additive and hardening ccelerator in order to improve the strength development of the secondary lining concrete. In this paper, we focus on temporal retention and strength development, and describe the details.

Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.

Password