[VI-433] Building case of the blasting work which approached an existing pier in pneumatic caisson
Keywords:pneumatic caisson, blasting, vibration velocity, vibration level
The report of the construction example that used a blasting charge method of construction that I approached a supporting beam offering open about the caisson basics in the river which a process would construct by bedrock digging strictly in the non-flood period for two years together.