Japan Society of Civil Engineers 2019 Annual Meeting

Presentation information

第VI部門

山岳トンネル (13)

Wed. Sep 4, 2019 10:25 AM - 11:55 AM VI-12 (幸町総合教育棟 第31大講義室)

座長:石田 滋樹(中電技術コンサルタント)

[VI-463] Exploration of Swellable Tertiary Layer by TDEM method (Part 2)

*原 敏昭1、磯 真一郎、斎藤 章 (1. 戸田建設株式会社)

Keywords:TDEM, Tunnel, Resistivity, Swellable ground, Numerical simulation

In mountain tunnels, in tunnels that show swelling, displacement is large and work is often difficult. Therefore, in the swellable ground, the CEC value decreases and the specific resistance value decreases, so in the mudstone area where the specific resistance value is low, exploration is made of a non-swellable ground area and a ground area. As well as how sensitive it is to detect swellable ground by the field survey results by TDEM method, and to what extent is it sensitive to the discrimination of low resistivity layer. And the exploration accuracy was confirmed through numerical simulation.

Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.

Password