Japan Society of Civil Engineers 2019 Annual Meeting

Presentation information

第VI部門

シールドトンネル (5)

Wed. Sep 4, 2019 8:40 AM - 10:10 AM VI-2 (幸町北8号館 812講義室)

座長:服部 鋭啓(大林組)

[VI-492] The result of initial launching and risk countermeasure for large diameter shield tunnel

*たみあ とりあんでぃに1、村上 初央1、坪井 広美2 (1. 西松建設(株) 土木設計部、2. 西松建設(株) 関東土木支社)

Keywords:Large Diameter Shield, Initial launch, NOMST wall, Measurement, Project Result

Yokohama-shonan road project are located about 300 km from 3 main ring road in kanto area. The segment thickness of this shield tunnel construction project was changed to 85mm from initial planning. Therefore, diameter of shield machine became larger than diameter of cutting wall (NOMST). Whereas, it was necessary to change the initial plan of shield launch. This paper are discuss about the review of initial launch plan, risk countermeasure of initial launch, and the report of initial launch results.

Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.

Password