[VI-570] Kamitagawa river bridge Concrete slab replacement project -PCa concrete panels application on PC composite girders-

*仲田 宇史1、富永 高行1、天野 寿宣1、檜作 正登2、内田 雅一2 (1. 大林組、2. 中日本高速道路)

Keywords:Slab replacement, Precast panels, Prestressed concrete composite girders, Rapid construction , Shortening construction schesdule, Post-installed anchor

This paper is the report where PCa concrete panels are applied to existing PC composite girders for concrete slab replacement project. It is the common way that the concrete slabs are casted on the concrete girders for slab replacement, but in this project the precast panels are used for the rapid construction. The detail of design is repotred from structural aspect, especially the connection between girders and panels, fatigue strength.

Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.

Password