[VI-715] Planning and design features of the Nishigou dam remodeling work for dam passing sand operation

*高木 秀和1、佐藤 努2、江島 裕章1、中村 正雄1 (1. ㈱熊谷組、2. 九州電力㈱)

Keywords:Concrete dam, Dam redevelopment, Fallback, throughing

About remodeling plan of Saigo dam which is the inundation damage control by typhoon 14 of 2005 in the Mitokawa water system of Miyazaki Prefecture. This report describes the design and design features of the Saigo Dam remodeling work.