Japan Society of Civil Engineers 2019 Annual Meeting

Presentation information

第VI部門

維持・管理/検査技術・診断 (12)

Thu. Sep 5, 2019 4:10 PM - 5:40 PM VI-12 (幸町総合教育棟 第31大講義室)

座長:宇野 洋志城(佐藤工業)

[VI-762] Consideration about concrete condition for expressway tunnel lining

*笹本 直之1、渡邉 太一郎2、大窪 克己1、平野 紘司1 (1. 中日本ハイウェイ・エンジニアリング東京、2. 中日本高速道路)

Keywords:tunnel, concrete cracks , Fiber Reinforced Concrete, Relative humidity, drying shrinkage, highway maintenance

For concrete cracks of tunnel lining on the Shin-Tomei Expressway, comparison of initial inspection before opening and initial inspection five years after opening from differences in a type of concrete fiber and inside of the tunnel environment

Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.

Password