Thu. Sep 5, 2019 8:40 AM - 10:10 AM VI-5 (幸町総合教育棟 第11大講義室)

座長:橘 直毅(中央復建コンサルタンツ)

[VI-923] Development of "high-speed, high-rigidity bolt (high-high bolt) system"

*水谷 和彦1、金子 和己1、足立 忠彦2、寺戸 秀和3、森田 篤1、松下 弘樹1、野田 力1、浅井 勉2、岩本 昭仁2、安田 耕治2 (1. 前田建設工業(株)、2. (株)カテックス、3. (一社)日本建設機械施工施工協会 施工技術総合研究所)

Keywords:high-speed, high-rigidity bolt , high speed construction , supplementary construction method, High strength improved ground

High speed ,high rigidity bolt system uses high rigidity bolt for core material.This system enables high-speed drilling compared to the conventional double-pipe drilling method, so the drilling water does not disturb the ground.The combination of high-rigidity bolt and high-strength silica resin can suppress ground displacement early.In this report, we report on the field application case of the developed "high-speed, high-rigidity bolt (high-high bolt) system".