[VI-981] The Sinking Achievement of the Longest Immersed Tunnel in Japan by Tower Pontoon Method
Keywords:Immersed Tunnel, Tower Pontoon Method, Winch Tower, Pontoon, Device for Searing the end face, Segment Positioning System
We describe the Measurement System used for Transport Towing Work and Immersing Work by Tower Pontoon Method when constructing the Longest Immersed Tunnel in Japan (No.1 Segment Length : 134m )
Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.