[VI-985] Construction of Cooling Water Outfall Facility for Power Plant using Box Culverts

*杉本 悠1、岡原 義典1、鶴橋 宏昌1、木之下 聡1 (1. 大成建設)

Keywords:Overseas, Culvert, Submerge, Power Plant, Cooling Water Facility

Construction of Cooling Water Outfall Facility for Power Plant using Box Culverts

A presentation on construction method of Cooling Water Outfall Facility for Power Plant using Box Culverts which is popular among South East Asia countries.

Outfall facility, which length is around 1.7km, was constructed with 150nos of submerged box culvert prefabricated on land.
Quite simple method and no particular technical background as well as special skill required. Cost would be much cheaper comparing with steel pipeline method.