[VII-165] In site test of backfilling material by spraying method of small cross section tunnel in the Mizunami underground Research Laboratory (2)
Keywords:Spraying method, Backfilling, Cycle time, Effective clay dry density, Monitoring, 3D sccaner
As part of the development of geological disposal and backfilling technology options for crystalline rock in Japan, we examined the feasibility of full-section spraying method, in the Mizunami Underground Research Laboratory. In this report, we evaluated the applicability of the spraying method to the small cross section tunnel from the viewpoint of construction and quality. Besides, we evaluated the effectiveness and issues of density measurement and monitoring method implemented as a quality confirmation method.
Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.