Japan Society of Civil Engineers 2020 Annual Meeting

Presentation information

[共通セッション] BIM/CIMの活用とこれから

BIM/CIMの活用とこれから(1)

Chair:Fumihiro Ojima

[CS14-10] System Development and Site Application Based on the CIM Guidelines (Draft) for Mountain Tunnnel Construction

〇Iwao Miyata1, Mitsuyoshi Tokunaga1, Mitsuhiro Yoshida2, Zenichi Igarashi3, Kazuhiro Miyatsuji3 (1.OKUMURA CORPORATION, 2.MINISTRY OF LAND,TRANSPORT AND TOURISM, 3.PASCO CORPORATION)

Keywords:Mountain Tunnel Construction, Construction Information Modeling/Management, Mobile Mapping System, 3D Laser Measurement, 3D Point Cloud Data, Intensity

Base system is developed in CIM guidelines. Drilling mountain tunnel construction and placing lining concrete is collected in CIM data. At drilling stage, visualization was achieved by importing data, and by converting "A measurement data" into 4D. After construction of shotcrete and placing of lining concrete, we perform 3D measurement by MMS. By using CIM, we can do the following 1.Securing cross-section design 2.Calculating volume of concrete lining, 3.Checking support and bolts, 4. Checking lining concrete thickness. Finally, we realize efficiency and sophistication of construction.

Please log in with your participant account.
» Participant Log In