[I-377] Large-scale renewal project of birdge constructed in the Taisho period

〇Takusen Mutaguchi1, Yasuo Ito1, Toshio Oomae2, Keisuke Takahashi3 (1.IHI Infrastructure Systems, 2.Ministry of Land, Infrastructure and Transport, 3.Yokogawa NS Engineering)

Keywords:large-scale renewal, floor slab replacement, seismic reinforcement, reniforced concrete floor slab, steel orthotropic deck, monitoring

Yodogawa -Bridge is a heavy traffic road bridge consisting of 24 -spans of plate girder constructionspans and 6 truss central -spans ofs truss construction, and has been utilized in service for over 90 years. The main structures and RC slabs were have been repaired many times because of the damage caused by bombing during the World War II, the 1995 Southern Hyogo Prefecture Earthquake and aging. Because the RC slabs have had suffered the rebar corrosion and the concrete delamination. Hence, in this project, the deteriorated RC slabs were replaced by the steel orthotropic decks without closing the road to traffic.

Please log in with your participant account.
» Participant Log In