Japan Society of Civil Engineers 2020 Annual Meeting

Presentation information

第VI部門

品質管理(4)

Chair:Masanori Matsui

[VI-824] Analysis and countermeasures for concrete crack apparition in mass concrete casting

〇Yoshihiro Hoshika1 (1.MAEDA CORPORATION)

Keywords:mass concrete

At Tokyo Outer Ring Road Tomei Junction “A” Ramp worksite, a mass concrete box culvert structure of 11.8m high, and 1.51.8m wall thickness is being built (Figure1).
In order to prevent the apparition of mass concrete cracks due to hydration heat, a list of countermeasures based on a thermal stress analysis is reported.

Please log in with your participant account.
» Participant Log In