施工計画(1)

Chair:Kouichi Fucci(KAJIMA)

[VI-1023] Track switching plan for wiring improvement at Shin-Tsurumi signal station

〇Masaki Tanimura1, Ryota Nakaya1, Kenta Moriyasu1 (1.East Japan Railway Company)

Keywords:Wiring plan, Line switching, Railway crane truck, Shin-Tsurumi signal field

The Shin-Tsurumi Signal Station is a signal station where the Tokaido Freight Line and the Musashino Line branch, and about 60 round trips / day trains operate. Since the start of JR, the importance of routes has increased. At present, the Tokaido Freight Line and the Musashino Line cross at the Shinagawa and Nishi-Funabashi lines. Therefore, the degree of freedom and flexibility of the diamond setting are improved by adding lines. For the extension of the track, the switching work (STEP1 to STEP4) was planned with the insertion and removal of two sets of turnouts as long-term work with the train interval expanded. This time, we describe the construction plan and risk measures for STEP3 line switching.

Please log in with your participant account.
» Participant Log In