[CS3-26] Designed to extend the life of the Hijiribashi, which was restored when it was completed in 1927.
Keywords:Longer life, Seismic retrofitting, Repair design, Bridge landscape, Architectural design, Civil engineering heritage
Please log in with your participant account.
» Participant Log In