[III-21] Case study on geological survey ahead of excavation face in mountain tunnel with high overburden
Keywords:high overburden, survey ahead of face, tunnel seismic probe drilling, T-SPD, Ultra-long controlled boring, energy of drilling
Please log in with your participant account.
» Participant Log In