[VI-401] Proximity construction of headrace tunnel 2.3m from existing tunnel at minimum distance
Keywords:proximity, controlled blasting, non-explosive crushing agent, vibration velocity, K value, slot drilling method
Please log in with your participant account.
» Participant Log In