11:10 AM - 11:20 AM
[II-17] A STUDY ON APPLICABILITY OF THE LONG TIME ENSEMBLE FORECASTS OF PRECIPITATION FOR THE HYDROELECTRIC POWER DAM OPERATION
Keywords:hydroelectric power dam, planned pre-flood drawdown, long time ensemble forecasts of precipitation, increasing the output(GWh), reduction of the flodd risk
Please log in with your participant account.
» Participant Log In