5:10 PM - 5:20 PM
[VI-179] Reports of the groundwater level lowering work for Gorokugawa Ushiki drainage gutter gate construction in the Saikawa flood control basin
Keywords:flood control basin, drainage gutter gate, heaving , groundwater level lowering, construction in the dry, superwellpoint method
Please log in with your participant account.
» Participant Log In