4:20 PM - 4:30 PM
[VI-557] Investigation of the cause and countermeasures for the defect in the cross section of the pile head of the cast-in-place reinforced concrete pile (by all-casing construction method)
Keywords:Cast-in-place reinfosed concrete pile, all-casing construction method, Insufficient pile diameter, Surplus concrete, Swing pulling out
Please log in with your participant account.
» Participant Log In