2:00 PM - 2:10 PM
[VI-783] Development of a Seismic Survey System ahead of the Tunnel Face using Non-Core Drilling
Keywords:Tunnel Seismic While Drilling, seismic survey, water-powered hammer, non-core drilling, mountain tunnel, survey ahead of a tunnel face
Please log in with your participant account.
» Participant Log In