10:15 AM - 10:30 AM
[208] STUDY ON FLOOD MITIGATION OPERATION OF TANDEM SERIES OF DAMS INCLUDING HYDROPOWER DAMS IN OHI RIVER
Keywords:hydropower, long time ensemble forcast, pre-release, RRI model, tandem series of dams
Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.