[VI-189] Outline of the construction of long rail on the ground part of sales lines

*大澤 純一郎2、磯崎 悠1、大竹 真人1、武藤 義彦1 (1. メトロレールファシリティーズ、2. 東京地下鉄)

Keywords:Long rail, Telescopic seam removal・new construction, Temporary fastening material for telescopic seam, Short-time construction

Tokyo Metro is promoting the use of long rails on the ground to reduce noise and reduce maintenance. The ground section between Chiyoda Line Ayase Station and Kitasenju Station was not long rail at the beginning of business. In the year 2000, the 550 m of the Ayase set was changed to a long rail, but the Kitasenju was still a fixed-length rail because the construction work of the Joban New Line was planned. A total of 950 meters of long-rail construction was carried out before Arakawa Bridge from 2016 to 2018. We will report on the contents of the examination and the preparation work and the outline of the long rail construction work.

Abstract password authentication.
Password is required to view the abstract. Please enter a password to authenticate.

Password